Lightning Light Sport Aircraft
 

NEWSLETTERS

Procedure Last Update
Cover  
Introduction 8/18/2008
1. Preparing Fuselage 10/29/2009
2. Seat Bulk Head Assembly 05/05/2009
3. Opera Window Installation 05/05/2009
4. Instrument Panel Support 05/05/2009
5.Spar Box Overview and Finish Assembly 05/05/2009
6. Electric Pitch Trim Installation 05/05/2009
7. Seat belt Installation 05/05/2009
8. Seat Installation 08/06/2009
9. Fuel system final installation 01/22/2008
10. Wing Prep 11/25/2008
11. Spar box install and Wing alignment 02/06/2010
12. Outboard Aileron Hinge  
13. Inboard Aileron Hinge 02/06/2010
14. Wingtip Vents 02/06/2010
15. Fuel Sending Unit Installation  
16. Wing Final Installation  
17. Horizontal Tail Prep 02/03/2009
18. Elevator Hinge Fabrication  
19.Elevator Balance Modification 11/15/2008
20. Horizontal Tail Installation 02/03/2009
21. Elevator Final Installation 02/03/2009
22. Vertical Tail Prep  
23. Rudder Installation  
24. Master Cylinder Installation 02/20/2008
25. Pedal Assembly 01/22/2008
26. Pedal Support Beam  
27. Flutetube fabrication  
28. Flute tube support  
29. Pedal Assembly final install  
30. Firewall layout and preinstall  
31. Firewall final install 01/22/2008
32. Engine mount instal  
33. Installing the Engine  
34. Fitting the Cowl  
35. Oil Cooler Inlet Install  
36. Firewall Forward Systems Install  
37. Spinner & Prop 01/22/2008
38. Nose gear assembly  
39. Main gear axle and brakes 02/06/2010
40.Set Main Gear Alignment  
41. Canopy Hinges 02/05/2008
42. Canopy Latches 04/22/2008
43. Fitting the Canopy 04/16/2008

44.  Weight & Balance

05/1/2008





 
 
  Arion Aircraft, LLC • 2842 Highway 231 North • Shelbyville, TN 37160 • 931-680-1781 |  Site Design by VW Web Design