Lightning Light Sport Aircraft
NEWSLETTERS
Procedure
Last Update
Cover
Introduction
8/18/2008
1. Preparing Fuselage
10/29/2009
2. Seat Bulk Head Assembly
05/05/2009
3. Opera Window Installation
05/05/2009
4. Instrument Panel Support
05/05/2009
5.Spar Box Overview and Finish Assembly
05/05/2009
6. Electric Pitch Trim Installation
05/05/2009
7. Seat belt Installation
05/05/2009
8. Seat Installation
08/06/2009
9. Fuel system final installation
01/22/2008
10. Wing Prep
11/25
/2008
11. Spar box install and Wing alignment
02/06/2010
12. Outboard Aileron Hinge
13. Inboard Aileron Hinge
02/06/2010
14. Wingtip Vents
02/06/2010
15. Fuel Sending Unit Installation
16. Wing Final Installation
17. Horizontal Tail Prep
02/03/2009
18. Elevator Hinge Fabrication
19.Elevator Balance Modification
11/15/2008
20. Horizontal Tail Installation
02/03/2009
21. Elevator Final Installation
02/03/2009
22. Vertical Tail Prep
23. Rudder Installation
24. Master Cylinder Installation
02/20/2008
25. Pedal Assembly
01/22/2008
26. Pedal Support Beam
27. Flutetube fabrication
28. Flute tube support
29. Pedal Assembly final install
30. Firewall layout and preinstall
31. Firewall final install
01/22/2008
32. Engine mount instal
33. Installing the Engine
34. Fitting the Cowl
35. Oil Cooler Inlet Install
36. Firewall Forward Systems Install
37. Spinner & Prop
01/22/2008
38. Nose gear assembly
39. Main gear axle and brakes
02/06/2010
40.Set Main Gear Alignment
41. Canopy Hinges
02/05/2008
42. Canopy Latches
04/22/2008
43. Fitting the Canopy
04/16/2008
44. Weight & Balance
05/1/2008
Arion Aircraft, LLC • 2842 Highway 231 North • Shelbyville, TN 37160 • 931-680-1781 | Site Design by
VW Web Design